Wastewater Facility The Village of Carpentersville

Building a Better Tomorrow . . . Today

Sludge Press
Search Site

Advanced Search

Directory
Job Openings
Calendar
Newsletter
Web Links

 

 

PUBLIC WORKS — WASTEWATER DIVISION

The Wastewater Facilities Division of Public Works is dedicated to safeguarding the environment and public health by maintaining the highest level of treatment at the lowest attainable cost for the residents of Carpentersville. It is our goal to continually improve by applying new technology and providing professional and courteous customer service to our residents.

In addition to wastewater treatment, other responsibilities include but are not limited to:

  1. Sample collection and analysis.
  2. Maintenance of building and equipment within the Main Plant and 12 remote facilities.
  3. Industrial discharge monitoring.
  4. Bio-solids production and disposal.

 

2010/2011 ACCOMPLISHMENTS

  1. Maintained wastewater discharge quality that exceeded state and federal regulations.
  2. As a result of an EPA Compliance Evaluation Inspection our facility was found to be in compliance with all water pollution regulations
  3. Continued to monitor and enforce Village ordinances pertaining to commercial and industrial inflows.
  4. Continued to implement maintenance procedures to ensure regulatory compliance and preserve Village assets.
  5. Repaired a third aeration shaft assembly on Oxidation Ditch.
  6. Maintained substantial odor reduction of Main Plant bio-solids.
  7. Reduced required IEPA sludge testing frequency through improved process control and digested sludge stabilization.
  8. Replaced one rotary lobe blower for the aerobic digestion process.
  9. Installed electrical connection of a flow meter for one lift station.
  10. Accepted control and responsibility for one new lift station located in the Winchester Glen Subdivision.
  11. Reduced city water used at the WWTF by 50%.
  12. Replaced dewatering belts on both filter presses.
  13. Replaced 40% of the aging effluent disinfection piping system.
  14. Re-implemented the lift station inspection program.
  15. Successfully secured a contract for Bio-solids disposal.

2011/2012 OBJECTIVES

  1. Continue to monitor and enhance facility processes to ensure regulatory compliance.
  2. Continue to monitor and regulate present and future commercial and industrial inflows.
  3. Continue to provide training and support for our employees.
  4. Continue to maintain facility and lift station equipment and infrastructure.

ORGANIZATIONAL CHART

Public Works/Wastewater Organizational Chart

 

PERSONNEL SCHEDULE
Budget
2009/2010

Budget
2010/2011
Projected 2011/2012 Projected 2014/2015

 

Full-Time

8

7

6

10*

Part-Time

0

0

0 0

* Projected staffing level is a recommendation based on population and comparable communities.


More information on our Wastewater System


Contact Information:

Joe Egler,Wastewater Superintendent
1070 Tamarac Drive
Carpentersville, IL 60110
Phone: (847) 551-3490

E-Mail: jegler@vil.carpentersville.il.us

Top of Page

Quick Links
Department Home
Street Division
Underground Division
Water Division
Water Quality Reports
Public Works Facility

Anonymous
Tip Lines --

Crimes
847/551-3488

Code Violations
847/426-9600

Pothole Hotline...
to report locations
call 847/551-3495
Street Light Outage...
call 847/836-2464

 

© 1999 - 2011 Village of Carpentersville.   All rights reserved.   Website design by Vision21Enterprises.   Read Our Disclaimer. Updated: 01/18/2012