| PUBLIC WORKS — UNDERGROUND DIVISION
The Underground Utilities Division is committed to providing a full range of maintenance and repair to the Village of Carpentersville underground infrastructure.
The Division has two main objectives. The Underground Utilities division is responsible for maintaining the water; wastewater, and storm conveyance infrastructures, thus, the split/shared budget, responsibilities include but are not limited to:
Water Distribution
- Water main repairs and updates.
- Valve and hydrant maintenance, repair, and replacements.
- System mapping and CAD updates.
Sanitary Collection
- Annual sewer main cleaning, which includes root and grease removal.
- Sewer main and structure (manhole) repairs.
- System televising, mapping and CAD updates
Storm Conveyance
- Catch basin maintenance, reconstruction, and replacement.
- Mainline cleaning.
- System televising, mapping and CAD updates.
Additional Division Responsibilities
- J.U.L.I.E. locates.
- New construction inspections and Acceptance/ Maintenance punch lists.
- Construction restorations (concrete and landscaping).
- Building and equipment maintenance.
- Plan review.
- Contractor assistance.
2008/2009 ACCOMPLISHMENTS
- B-boxes: Replaced 53, repaired 4, and cleaned 40.
- Fire hydrants: Replaced 22, repaired 169, painted 351, and inspected and flushed entire system.
- Main breaks: Repaired 8.
- Distribution Valves (in house): Replaced 40 and cleaned 40.
- Distribution Valves (contracted): Replaced 3.
- Cleaned lines for Monthly “Bad Spot” program totaling 64,668 linear feet.
- Responded to 90 sewer calls that included jetting 21,118 linear feet (only 18 were mainline blockages).
- Annual Sanitary Jetting Program: Cleaned 179,231 lin. ft. Root Cut 6,404 lin. ft.
- Sanitary Manholes: Replaced 1 and repaired 6.
- Sanitary Main: Replaced 16 lin. ft. at two locations and completed 2 mainline repairs.
- Storm structures: Replaced 2 , rebuilt 17.
- Storm Sewer: Replaced 620 lin. ft. at seven locations.
- Spent 279.5 man-hours cleaning storm lines and 958 man-hours cleaning inlets.
- Performed 2,251 J.U.L.I.E. locates ( 1160.5 man-hours).
- Spent 555.5 man-hours performing atlas reviews, upgrades, and corrections.
- Responded to 362 citizen/service requests.
- Divisional Training: Class “A” CDL, Confined Space, Locator Operation, J.UL.I.E., Pipe Awareness, AWWA, and IPWSOA, Snow Operations, Main Break Safety, Uni-Bell Pipe, IRMA Training Videos, Quarterly Safety Discussions, NIMS 100, 200, and 700 certification (EMI – FEMA), San. Televising, Water Service Installations, Respiratory Protection, Vactor Operations, Defensive Driving, Line stop Installations, Monthly Assoc. Meetings (459 man-hours).
- Hauled in 256 loads ( 2,606 tons) of gravel, stone, and topsoil and disposed of 368 loads of spoil.
- Replaced concrete at 37 locations.
- Performed site restorations at 127 locations (20 loads of topsoil).
- Performed 8 acceptance/ maintenance punch lists.
- Spent 474.5 man-hours assisting contractors on capital projects.
- Reviewed 15 construction plans.
- Sanitary Sewer Lining: Will complete 2,900 lin. ft.
- Vehicles and Equipment: Performed 40 (in-house) repairs.
- Designed and built 32’x10’ storage deck and stairs at within facility.
- Successfully secured a contract for valve exercising.
2009/2010 OBJECTIVES
- T o operate, maintain, repair, and update the Village infrastructures through careful planning and use of Village staffing and contractual services.
- To develop long-term programs that identify, prioritize, and facilitate repairs and updates to each system in the most cost-effective manner while providing the best service possible to the community.
- Continue all existing programs. (Due to funding, sewer lining has been deleted and valve/hydrant replacements have been reduced).
- Clean the entire original sanitary system and root cut 20% of clay lines.
- Finish measurements of the Sanitary Sewer System and measure the Storm Conveyance System (current information shows discrepancies).
- Complete updates to the Utility Atlas.

ORGANIZATIONAL CHART

PERSONNEL SCHEDULE |
|
Budget 2007/2008 |
Budget 2008/2009 |
Projected 2009/2010 |
Projected 2014/2015 |
|
Full-Time |
9 |
11 |
11 |
15 |
Part-Time |
0 |
0 |
1 |
0 |
| |
|
|
|
|
Contact Information
Chris Settipani , Underground Superintendent
220 Lake Marian Road, Unit A
Carpentersville, IL 60110
Phone: (847) 551-3493
Email: CSettipani@vil.carpentersville.il.us

|