Substantial Improvement/Damage
The National Flood Insurance Program (NFIP) requires that if the cost
of improvements to a building or the cost to repair damages (from any
cause) to a building exceeds 50% of the market value of the building
(excluding land value), the entire building must be brought up to
current floodplain management standards. In addition, the Kane County
Stormwater Ordinance stipulates that the substantial improvement can be
reached by the cumulative reconstruction or repair of a structure; not
each expenditure. Building improvement projects include exterior and
interior remodeling, rehabilitation, additions and repair and
reconstruction projects. Please contact the Engineering Department at
847-551-3480 for further information.
|